United Arab Emirates · GRP Sectional Tank

‎Dubai Electricity and Water Authority

Professional on-site erection and commissioning of the GRP sectional water tank, including positioning, assembly, structural support fixing, accessory installation, final adjustment and readiness for service.

Project Description

Professional on-site erection and commissioning of the GRP sectional water tank, including positioning, assembly, structural support fixing, accessory installation, final adjustment and readiness for service.

Scope of Supply

GRP/FRP sectional tank panels Internal stainless-steel tie rods / bracing system External structural supports, as applicable Bolts, nuts, washers and fastening accessories Sealing materials / jointing sealant Manhole with cover Internal and external ladders Inlet connection Outlet connection Overflow connection Drain connection Vent connection Level indicator All standard accessories required for complete tank assembly

Products Supplied

GRP Sectional Tank

Installation Details

Complete assembly and erection of GRP sectional tank panels, installation of internal tie rods and bracing, fixing of bolts, sealing materials, manhole, ladders and tank connections, alignment and tightening of all components, joint sealing, final inspection and water leakage testing.